Step 1 - Our board of education requested research on our current facilities and engineering studies to determine the needs and viability for the future.
Step 2 - We developed a committee in February 2016 to look at the information we had collected and to help drive the initial conversation regarding our current and future facility needs in our district.
Step 3 - The committee developed four options they felt were viable for the current and future students at CPS.
Step 4 - We organized and promoted two forums for our community to attend.  The first one was held at Charlevoix Elementary School and the second at Round Lake Educational Center (Old Middle School).
Step 5 - We created an online survey for our community and staff in order to receive further input and direction.
Step 6 - Our committee will use what we have learned in the past year along with the information we obtain in the surveys to make a decision on what plan or plans to present to the board of education.
Step 7 - Present to the Board of Education.
Please don’t hesitate to call or stop by the central office if you have suggestions, questions or concerns. I hope that you will complete the online survey to help us prepare and plan for our current and future Rayders!  goo.gl/VWd62M (Please type this link into the URL)


Mike Ritter, Superintendent
Charlevoix Public Schools
231.547.8101
Charlevoix Public Schools
Environment Architects
Charlevoix Public Schools Facility Survey


In an effort to seek input from our community, our facility study committee would appreciate your completion of the following survey.  goo.gl/VWd62M

Option 1:
Elementary School Remodel at Existing Location + New Gym Addition
Total Sq. Feet - 81,983  
Minor Remodel - 60,882 Sq. Ft.   Major Remodel - 6,678 Sq. Ft.      
New Construction - 14,423 Sq. Ft.




How we are addressing concerns:
–Addition of Gym to provide additional space
–ADA improvements to: bathrooms; door hardware
–Energy Improvements: Windows, doors, lighting and finishes.
–Roofing (100%)
–Replace AHU at Gym including ductwork Computer Lab and Media Center; A/C at entire building; Kitchen Ventilation System; Mechanical Controls; Lighting fixture replacement


Option 2:
Enhanced Remodel of Round Lake for Elementary School
Total Sq. Feet - 88,195
Minor Remodel - 40,051 Sq. Ft.   Major Remodel - 35,349 Sq. Ft.        
New Construction - 12,795Sq. Ft
.



Addressing concerns:
–Utilizes existing gym
–ADA improvements to: bathrooms; door hardware
–Energy Improvements: Windows, doors, lighting and finishes.
–Roofing
–Mechanical and Plumbing: A/C upgrades at Gym, Commons and Admin.; Classroom Unit Ventilator Replacement; Kitchen Ventilation System; HVAC controls; replace plumbing fixtures; replace galvanized piping
–Project can be completed while existing elementary remains operational
–Plumbing modifications/new to support elementary operation(ie: baths at classrooms)
–Some aesthetic enhancements to existing exterior



Option 3:
New Elementary School at Round Lake Campus
Total Sq. Feet - 82,187
Minor Remodel - 12,627 Sq. Ft.    Major Remodel - 0 Sq. Ft.  
New Construction - 69,560 Sq. Ft.






Addressing concerns:
–Utilizes existing gym
–Primarily New facility
–High energy Efficiency
–Project can be completed while existing elementary remains operational

Option 4:
New Elementary School at High School Complex
Total Sq. Feet - 81,983
All New Construction





Addressing concerns:
–New facility
–Highest energy Efficiency
–Consolidated location at high school
–Project can be completed while existing elementary remains operational


Important Details


Facility Study Committee Members
Chuck Center   Dick Joseph Doug Drenth
Douglas Bergmann   Jacq Dipert     Shelly Novotny
Krista Jarema   Lisa Meyer   Lucas Porath
Mike Hinkle   Mike Moon   Mike Ritter
John Martin   Suzanne Klinger   Jim Marsh  


Current Facilities
Charlevoix Elementary School – 1969
Round Lake Educational Center – 1961
Charlevoix Middle/High School – 2002


We Studied Five Viable Solutions
  • Use 2015 bond funds as planned at CES
(What do we do with RLEC?)
  • Remodel and Build a New Gym at CES
  • Enhanced Remodel of RLEC
  • New Elementary at RLEC Campus
(Keeping the gymnasium and boiler rooms)

  • New Elementary at CMHS Campus